Skip to main content
FREE Delivery!|(501) 596-6225

Washington County, Arkansas ยท Free Delivery

Bulk Gravel Delivery to Farmington, AR

Free delivery to Farmington on every order, with loads arriving in as fast as 2 business days.

Delivering to Farmington, AR

Free delivery on every order.

  • Free delivery to Farmington
  • Order from 1 ton
  • As fast as 2 business days

Gravel delivered to Farmington

Crushed gravel and base materials that compact under tires.

SB-2 Base

3/4" minus blend compacted under roads and heavy-load areas

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Farmington

Rock & Stone delivered to Farmington

Graded crushed stone for drainage, concrete and heavy work.

RipRap

4" to 12"+ rock for shorelines, slopes and culvert outlets

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Farmington

Decorative delivered to Farmington

Rounded stone for beds, borders and water features.

Sand delivered to Farmington

Washed sand for masonry, concrete and leveling.

Soil, Fill & Mulch delivered to Farmington

Soil and fill by the ton, mulch by the cubic yard.

Fill Dirt

Compactable dirt for grading, backfill and low spots

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Farmington

How delivery to Farmington works

  1. 1

    Pick the material and quantity.Open a product to see your price, with free delivery to Farmington.

  2. 2

    Choose a delivery date at checkout.As fast as 2 business days for most Farmington addresses.

  3. 3

    Clear a drop spot.The truck tips the load where you mark it. Note low wires or branches when you order.

Not sure how much you need?

Enter length, width and depth and the calculator returns the cubic yards and tons for your project.

Open the calculator

Order gravel and aggregate delivery in Farmington, AR online and let Arkansas Rock Supply drop it at your site. Pick your material by the ton or the yard, size the load, and choose a delivery date at checkout.

SB-2 base is the standard Arkansas base material here, a dense-graded 1 1/2 inch minus crushed stone with the fines left in. It locks up under a roller for driveways, parking pads, shed pads and pipe bedding.

Ground and Conditions in Farmington

This is Ozark Plateaus ground: cherty, acid clay loam over limestone and dolostone, with chert gravel through the profile. On side slopes, rock and rubble sit close to the surface.

Water here leaves through the rock rather than across it. Sinkholes, fractured limestone and losing streams take runoff underground fast, while the residual clay filling the joints holds water at the surface after a long rain.

A thin base fails first where that clay sits. The stone works down into soft ground, ruts form, and the drive loses its shape before the surface ever wears out.

The fix is a real compacted base layer of SB-2 over stable, drained ground. Build the pad up out of the wet before the base course goes on, and the surface holds.

Steep hollow slopes and flashy streams scour drive shoulders, culvert outlets and creek banks in heavy spring rain. Base, drive and patio work runs almost all year otherwise.

Winter cold snaps and a wet spring interrupt it, and the late-summer dry spell is the easiest time to get real compaction.

Freezes come in runs from December into February, and shallow freeze-thaw lifts loose gravel and heaves unbound surfaces before spring. For footings, the Arkansas residential code has each jurisdiction set the frost line and requires exterior footings at least 12 inches below undisturbed ground.

Materials for Farmington Projects

Screenings do the fine work on paths and walkways. This is the Arkansas trade name for crusher fines, and the material beds pavers, flagstone and brick, fills joints, and leaves a tight walking surface.

Lay Screenings over a compacted base and you get a path that stays put underfoot instead of rolling under a shoe. Use Walkway Gravel where you want a coarser, walkable garden path or side yard surface.

Underneath, SB-2 Base carries the load. Cities and engineers write the same material into street, sidewalk and parking standards as Class 7 base, or Class 7 aggregate base course, so use that name when you are working to a written spec.

For drainage, #57 Limestone is the washed workhorse: French drains, foundation and pipe drainage, and a clean top over compacted base. 3/4" Crushed Stone handles drainage beds and construction entrances.

For decorative beds and dry creek beds, Arkansas River Rock and Large River Rock give you rounded stone, and RipRap armors banks, slopes and culvert outlets.

Delivery to Farmington and the Surrounding Area

Choose between tons and yards when you order. Each product page has a calculator, so size the load there before you check out.

Pick your delivery date at checkout and a dump truck tips the load in one pile at your site. Have the spot clear and reachable.

Arkansas Rock Supply delivers across Washington County, including Fayetteville, Springdale, Prairie Grove, Elkins and West Fork. Farmington orders go out the same way.

Order Gravel and Aggregate for Your Farmington Project

Size your load on the calculator, pick the material, and set a delivery date at checkout. Arkansas Rock Supply delivers SB-2 base, screenings and washed stone across Farmington and Washington County.

Place your order online and get the pile where you need it.

Frequently Asked Questions

Common questions about gravel and aggregate delivery in Farmington, AR

What should I have ready when the truck arrives?

Clear the drop spot so the truck can reach it and tip the load in one pile without obstruction. Know where you want that pile to sit, because the driver tips it there and leaves. If the ground is soft from a long rain, pick a firm spot so the truck does not sink. Have your material and quantity settled before the truck shows up.

What is the best base under pavers in Farmington?

Use SB-2 base, the dense-graded 1 1/2 inch minus crushed stone with the fines left in, compacted as your base course. Then bed the pavers in screenings, the Arkansas name for crusher fines, which levels and locks the units and fills the joints. That pairing handles the cherty clay loam and the water that sits at the surface here.

What happens if the weather turns?

We would rather move a delivery than tear up your ground. If the site is too wet for the truck on the day, we will call you and rebook. Tell us in advance about any part of the approach that does not drain and we will plan around it.